Current through Register Vol. 30, No. 50, December 13, 2024
Section R18-4-208 - Sanitary SurveysA. Each public water system shall undergo sanitary surveys in accordance with a schedule established by the Department, or when the Department determines that a sanitary survey is necessary to assure compliance with this Chapter.B. A sanitary survey shall be performed for a public water system at least once every five years; however, a non-community water system using only protected and disinfected ground water shall have a sanitary survey performed at least every 10 years.C. When establishing a sanitary survey schedule or determining that a sanitary survey is required prior to the next scheduled sanitary survey, the Department shall consider: 1. The quality and quantity of the source water; and2. Whether the system is properly designed, maintained and operated.D. Proper operation and maintenance means operating and maintaining the public water system in compliance with this Chapter; 18 A.A.C. 5, Article 5; and in conformance with the applicable portions of Engineering Bulletin No. 10, "Guidelines for the Construction of Water Systems," incorporated by reference in A.A.C. R18-5-502.E. The Department shall review the results of a sanitary survey to determine whether the existing monitoring frequency is adequate, and whether any additional measures are required in order to ensure that the system will remain in compliance with this Chapter.F. In conducting a sanitary survey of a groundwater system, information on sources of contamination within a delineated wellhead protection area shall be considered by the Department instead of collecting new information, if the information was collected since the last time the system was subject to a sanitary survey.G. A water supplier shall make the changes to the design, operation, and maintenance of the public water system specified by the Department in order to bring the system into compliance with the requirements of this Chapter, and shall make the changes within the time limits set by the Department.H. A sanitary survey of a public water system shall be made by a representative of the Department, a professional engineer or sanitarian who is registered in Arizona, a certified water system operator, or other person approved by the Department.I. A sanitary survey shall comply with A.R.S. § 41-1009 when conducted by the Department.Ariz. Admin. Code § R18-4-208
Adopted effective April 28, 1995 (Supp. 95-2). Amended effective June 3, 1998 (Supp. 98-3). Section R18-4-208 repealed; new Section renumbered from R18-4-118 and amended by final rulemaking at 14 A.A.R. 2978, effective August 30, 2008 (Supp. 08-3).