Facilities subject to the permit requirements of this Article shall submit a quality assurance plan to the Director that meets the requirements of R18-2-311(D)(3) within 12 months of the effective date of this Section. Facilities subject to the requirements of R18-2-313 shall submit a quality assurance plan as specified in the permit.
Ariz. Admin. Code § R18-2-314