Ariz. Admin. Code § 18-2-1415

Current through Register Vol. 30, No. 50, December 13, 2024
Section R18-2-1415 - Criteria and Procedures: Projects from a Plan and TIP
A. During all periods the project shall come from a conforming transportation plan and program. Otherwise, the project shall satisfy all criteria in Table 1 of R18-2-1409 for a project not from a conforming transportation plan and TIP. A project is considered to be from a conforming transportation plan if it meets the requirements of subsection (B) and from a conforming program if it meets the requirements of subsection (C).
B. A project is considered to be from a conforming transportation plan if one of the following conditions applies:
1. For projects which are required to be identified in the transportation plan in order to satisfy R18-2-1406, the project is specifically included in the conforming transportation plan and the project's design concept and scope have not changed significantly from those which were described in the transportation plan, or in a manner which would significantly impact use of the facility.
2. For projects which are not required to be specifically identified in the transportation plan, the project is identified in the conforming transportation plan, or is consistent with the policies and purpose of the transportation plan and will not interfere with other projects specifically included in the transportation plan.
C. A project is considered to be from a conforming program if all of the following conditions are met:
1. The project is included in the conforming TIP and the design concept and scope of the project were adequate at the time of the TIP conformity determination to determine its contribution to the TIP's regional emissions and have not changed significantly from those which were described in the TIP, or in a manner which would significantly impact use of the facility.
2. If the TIP describes a project design concept and scope which includes project-level emissions mitigation or control measures, enforceable written commitments to implement such measures shall be obtained from the project sponsor or operator as required by R18-2-1433 in order for the project to be considered from a conforming program. Any change in these mitigation or control measures that would significantly reduce their effectiveness constitutes a change in the design concept and scope of the project.

Ariz. Admin. Code § R18-2-1415

Adopted effective June 15, 1995 (Supp. 95-2).