Ariz. Admin. Code § 18-2-1407

Current through Register Vol. 30, No. 50, December 13, 2024
Section R18-2-1407 - Relationship of Transportation Plan and TIP Conformity with the Nepa Process

The degree of specificity required in the transportation plan and the specific travel network assumed for air quality modeling do not preclude the consideration of alternatives in the NEPA process or other project development studies. Should the NEPA process result in a project with design concept and scope significantly different from that in the transportation plan or TIP, the project shall meet the criteria in R18-2-1409 through R18-2-1427 for projects not from a TIP before NEPA process completion.

Ariz. Admin. Code § R18-2-1407

Adopted effective June 15, 1995 (Supp. 95-2).