Table 1 - Design Review Service Fees

Public Water System Design Review Application Types

Fees1, 2

Approval to Construct Public Water Supply Distribution System:

* 150 or fewer service connections

$1,284

* 151 to 300 service connections

$1,998

* 301 to 450 service connections

$2,711

* 451 to 600 service connections

$3,425

* 601 to 750 service connections

$4,138

* Each additional 150 service connections

Add $714

Water Treatment Plants and Blending Plans (including new source approval if applicable):

* < 0.1 mgd

$2,141

* >= 0.1 mgd and < 1 mgd

$2,854

* >= 1 mgd and < 5 mgd

$4,281

* >= 5 mgd

$7,135

Well (including new source approval if applicable)

$1,784

Storage Tank

$1,142

Booster Pump

$1,142

Main Line Extension

$357

Chlorinators/Disinfection Devices

$357

Extension of Time to Construct3

50% of the application fee, not to exceed $714

Priority Review Fee4

Double the Standard Fee

1 Fees are calculated on a per-unit basis; i.e., a separate fee is assessed for each separate storage tank, booster pump, disinfection device, or main line extension.

2 Fees for each application type are cumulative; an applicant must pay the total of all pertinent fees.

3 Extensions of time to construct are issued pursuant to A.A.C. R18-5-505(E); the Section states that an Approval to Construct becomes void if construction is not commenced or completed within a specified time period, unless the Department grants an extension of time.

4 Priority Review Projects require Department authorization prior to filing.

Ariz. Admin. Code tit. 18, ch. 14, art. 2, tbl. 1

Table 1, Design Review Service Fees, made by final rulemaking at 14 A.A.R. 4102, effective December 6, 2008 (Supp. 08-4). Amended by final rulemaking at 29 A.A.R. 1869, effective 8/4/2023.