Program Area | Permit Type | Maximum Fee |
APP | Individual or area-wide | $285,400 |
APP | Complex modification to individual or area-wide | $214,050 |
APP | Clean closure of facility | $71,350 |
APP | Standard modification to individual or area-wide (per modification up to the maximum fee, and modification can be reassigned under A.A.C. R18-1-516): * Maximum fee (cumulative per submittal) * Modification under A.A.C. R18-9-A211(C)(1) through (3) * Modification under A.A.C. R18-9-A211(C)(4) through (6) * Modification under A.A.C. R18-9-A211(C)(7), (D)(2)(b) through (i), and (k) through (l) * Modification under A.A.C. R18-9-A211(D)(2)(a) and (j) * Modification under A.A.C. R18-9-A211(B) that is not classi fied as complex modification under R18-14-101(2) | $214,050 No fee $7,135 $21,405 $35,675 $35,675 |
APP | For an APP issued before July 1, 2011, the fee for a submittal required by a compliance schedule is assessed per submittal and cumulative up to the maximum fee. The applicable maximum fee for all compliance schedule submissions shall be according to one of the three maximum fee categories listed below. The maximum fee is for the lifetime of the APP unless a new compliance schedule is established in the APP due to a modification that is classified as both a significant amendment under A.A.C. R18-9-A211(B) and a complex modification under R18-14-101(2) * For a permit with a compliance schedule where one or more submissions require a permit modification that requires a determination or reevaluation of BADCT, the fee is assessed as described above for each standard modification, with a maximum fee for the permit's entire compliance schedule of: * For a permit with a compliance schedule where one or more submissions require a permit modification, but no determination or reevaluation of BADCT is required, the fee is assessed as described above for each standard modification, with a maximum fee for the permit's entire compliance schedule of: * For a permit with a compliance schedule requiring one or more submissions that require ADEQ review but do not require a permit modification, the maximum fee for the permit's entire compliance schedule is: | $214,050 $142,700 $142,700 |
APP | For an APP issued on or after July 1, 2011, the fee for a submittal required by a compliance schedule is assessed per submittal and cumulative up to the maximum fee for the lifetime of the APP | $142,700 |
APP | Determination of applicability | $21,405 |
APP | Reviewing proprietary and other reviewed products under A.A.C. R18-9-A309(E) | $21,405 |
AZPDES | Individual permit for municipal separate storm sewer system | $57,080 |
AZPDES | Individual permit for wastewater treatment plant (based on gallons of discharge per day) * 3,000 to 99,999 * 100,000 to 999,999 * 1,000,000 to 9,999,999 * 10,000,000 or more | $21,405 $28,540 $42,810 $71,350 |
AZPDES | Individual permit for a facility or activity that is not a wastewater treatment plant or a municipal separate storm sewer | $42,810 |
AZPDES | Amendment to an individual permit | $17,838 |
AZPDES | Approval of a new or revised pretreatment program under AZPDES | $14,270 |
AZPDES | Consolidated individual permit for multiple AZPDES individual permits, as allowed under A.A.C. R18-9-B901(C) | Aggregate of the applicable maximum fees |
Reclaimed | Reclaimed water individual permit | $45,664 |
UIC | Area Area Modification / Renewal | $200,000 $150,000 |
UIC | Classes I, II, III, V Individual Classes I, II, III, V Modification / Renewal | $200,000 $150,000 |
UIC | Classes VI Individual Classes VI Modification | No Max No Max |
Ariz. Admin. Code tit. 18, ch. 14, art. 1, tbl. 1