Ariz. Admin. Code § tit. 18, ch. 14, art. 1, tbl. 1

Current through Register Vol. 30, No. 50, December 13, 2024
Table 1 - Maximum Fees

Program Area

Permit Type

Maximum Fee

APP

Individual or area-wide

$285,400

APP

Complex modification to individual or area-wide

$214,050

APP

Clean closure of facility

$71,350

APP

Standard modification to individual or area-wide (per modification up to the maximum fee, and modification can be reassigned under A.A.C. R18-1-516):

* Maximum fee (cumulative per submittal)

* Modification under A.A.C. R18-9-A211(C)(1) through (3)

* Modification under A.A.C. R18-9-A211(C)(4) through (6)

* Modification under A.A.C. R18-9-A211(C)(7), (D)(2)(b) through (i), and (k) through (l)

* Modification under A.A.C. R18-9-A211(D)(2)(a) and (j)

* Modification under A.A.C. R18-9-A211(B) that is not classi

fied as complex modification under R18-14-101(2)

$214,050

No fee

$7,135

$21,405

$35,675

$35,675

APP

For an APP issued before July 1, 2011, the fee for a submittal required by a compliance schedule is assessed per submittal and cumulative up to the maximum fee. The applicable maximum fee for all compliance schedule submissions shall be according to one of the three maximum fee categories listed below. The maximum fee is for the lifetime of the APP unless a new compliance schedule is established in the APP due to a modification that is classified as both a significant amendment under A.A.C. R18-9-A211(B) and a complex modification under R18-14-101(2)

* For a permit with a compliance schedule where one or more submissions require a permit modification that requires a determination or reevaluation of BADCT, the fee is assessed as described above for each standard modification, with a maximum fee for the permit's entire compliance schedule of:

* For a permit with a compliance schedule where one or more submissions require a permit modification, but no determination or reevaluation of BADCT is required, the fee is assessed as described above for each standard modification, with a maximum fee for the permit's entire compliance schedule of:

* For a permit with a compliance schedule requiring one or more submissions that require ADEQ review but do not require a permit modification, the maximum fee for the permit's entire compliance schedule is:

$214,050

$142,700

$142,700

APP

For an APP issued on or after July 1, 2011, the fee for a submittal required by a compliance schedule is assessed per submittal and cumulative up to the maximum fee for the lifetime of the APP

$142,700

APP

Determination of applicability

$21,405

APP

Reviewing proprietary and other reviewed products under A.A.C. R18-9-A309(E)

$21,405

AZPDES

Individual permit for municipal separate storm sewer system

$57,080

AZPDES

Individual permit for wastewater treatment plant (based on gallons of discharge per day)

* 3,000 to 99,999

* 100,000 to 999,999

* 1,000,000 to 9,999,999

* 10,000,000 or more

$21,405

$28,540

$42,810

$71,350

AZPDES

Individual permit for a facility or activity that is not a wastewater treatment plant or a municipal separate storm sewer

$42,810

AZPDES

Amendment to an individual permit

$17,838

AZPDES

Approval of a new or revised pretreatment program under AZPDES

$14,270

AZPDES

Consolidated individual permit for multiple AZPDES individual permits, as allowed under A.A.C. R18-9-B901(C)

Aggregate of the applicable maximum fees

Reclaimed

Reclaimed water individual permit

$45,664

UIC

Area

Area Modification / Renewal

$200,000

$150,000

UIC

Classes I, II, III, V Individual

Classes I, II, III, V Modification / Renewal

$200,000

$150,000

UIC

Classes VI Individual

Classes VI Modification

No Max

No Max

Ariz. Admin. Code tit. 18, ch. 14, art. 1, tbl. 1

New Table adopted by final rulemaking at 7 A.A.R. 564, effective January 2, 2001 (Supp. 01-1). Table 1 repealed by final rulemaking at 17 A.A.R. 568, effective July 1, 2011 (Supp. 11-2). Amended by final rulemaking at 28 A.A.R. 1811 (July 29, 2022). Amended by final rulemaking at 28 A.A.R. 1811, effective 9/6/2022. Amended by final rulemaking at 29 A.A.R. 1869, effective 8/4/2023.