Table 4. Type 2 and 3 General Permit Fees
Permit Description | Permit Fee | Renewal Fee |
Standard Type 2: 2.01, 2.03, 2.04, 2.05, and 2.06 | $2,141 | $714 |
Complex Type 2: 2.02 | $4,281 | $1,427 |
Standard Type 3: 3.02, 3.03, 3.05, 3.06, and 3.07 | $6,422 | $2,141 |
Complex Type 3: 3.01 and 3.04 | $10,703 | $3,568 |
Amendment to Notice of Intent | Same as applicable renewal fee | N/A |
Transfer of permit authorization | $71 | N/A |
If a site contains more than one facility covered by the same Type 2 or Type 3 General Permit and each facility is substantially similar in design, construction, and operation, the first facility is paid at the full applicable fee, and each additional facility is: | Half the applicable fee | Half the applicable fee |
Table 5. Type 4 General Permit Fees
Water Quality Protection Service | Description | Permit Fee |
4.01 General Permit: Sewage Collection Systems | Under each Notice of Intent to Discharge, the fee is assessed on a per-component basis for the components listed below and is assessed cumulatively up to the maximum fee: * Maximum fee * Force mains with design flow less than or equal to 10,000 gpd * Each additional increment of 50,000 gpd or less of force mains * Gravity sewer with design flow less than or equal to 10,000 gpd * Each additional increment of 50,000 gpd or less of gravity sewer * Each sewer lift station * Each depressed sewer * Realignment of existing sewer for a contiguous project that is less than 300 linear feet with no change in design flow or pipe size | $35,675 $1,427 $1,427 $1,427 $1,427 $1,427 $1,427 $714 |
4.01 General Permit courtesy review | If an applicant requests courtesy review, the Department shall approve or deny the request. When determining whether to approve a courtesy review request, the Department shall consider the complexity of the project and the Department's current work load | One-third applicable fee upon submittal, then balance of fee if Notice of Intent to Discharge is submitted with final documentation within 180 days of first submittal |
4.23 General Permit: 3,000 to less than 24,000 Gallons per day Design Flow | * Onsite wastewater treatment facility with up to: * Three treatment technologies and disposal methods consisting of technologies or designs that are covered under other Type 4 general permits; and * Two onsite wastewater treatment facilities * Maximum fee (cumulative) * Each additional onsite wastewater treatment facility on same Notice of Intent to Discharge up to maximum fee * Each additional treatment technology or disposal method consisting of technologies or designs that are covered under other Type 4 general permits on same Notice of Intent to Discharge up to maximum fee | $5,137 $10,703 $1,712 $714 |
4.23 General Permit annual report | Annual report required under A.A.C. R18-9-E323(G) | $285 |
Type 4 General Permits (4.02 through 4.22) | * Maximum fee * First Type 4 general permit * Each additional Type 4 general permit on same Notice of Intent to Discharge | $5,280 $1,712 $714 |
Alternative Design under A.A.C. R18-9-A312(G) | A request for an alternative design, installation, or operational feature, per alternative design: * Type 4.01 general permit * All other Type 4 general permits | $1,070 $357 |
Interceptor under A.A.C. R18-9-A315 | A design requiring an interceptor (per interceptor) | $143 |
Transfer | Transfer of discharge authorization | $71 |
Priority Review | If an applicant requests priority review, the Department shall approve or deny the request. When determining whether to approve a priority review request, the Department shall consider the complexity of the project and the Department's current work load. | Double the Applicable Fee (including any applicable maximum fee) |
Ariz. Admin. Code § R18-14-108