Ariz. Admin. Code § tit. 18, ch. 1, art. 5, Table 10

Current through Register Vol. 30, No. 45, November 8, 2024
Water Permit Licensing Time-Frames (Business Days)

Permits

Authority

Administrative Completeness Review

Substantive Review

Overall TimeFrame

AQUIFER PROTECTION PERMITS

Individual Permit

No public hearing

Public hearing

A.R.S. §§ 49-203, 49-242 18

A.A.C. 9, Article 2

35

35

186

2311

221

266

Complex Individual Permit

No public hearing

Public hearing

A.R.S. §§ 49-203, 49-242 18

A.A.C. 9, Article 2

35

35

249

2941

284

329

Individual Permit

Significant Amendment

No public hearing

Public hearing

A.R.S. §§ 49-203, 49-242 18

A.A.C. 9, Article 2

35

35

186

2311

221

266

Complex Individual

Permit Significant

Amendment

No public hearing

Public hearing

A.R.S. §§ 49-203, 49-242 18

A.A.C. 9, Article 2

35

35

249

2941

284

329

Individual Permit Other Amendment

A.R.S. §§ 49-203, 49-242 18

A.A.C. 9, Article 2

35

100

135

Temporary Individual Permit

A.R.S. §§ 49-203, 49-242 18

A.A.C. 9, Article 2

35

145

180

Type 3 General Permit

A.R.S. § 49-245

A.A.C. R18-9-D301 through R18-9-D307

21

60

81

4.01 General Permit

300 services or less More than 300 services

A.R.S. § 49-245 A.A.C. R18-9-E301

42

42

53

94

952

1362

Standard Single

4.02, 4.03, 4.13, 4.14, 5.15, and 4.16 General Permits

A.R.S. § 49-245 A.A.C. R18-9-E302, R18-9-E303, R18-9-E313, R18-9-E314

42

31

732

4.23 General Permit

A.R.S. § 49-245 A.A.C. R18-9-E323

42

94

1362

Standard Combined

Two or three Type 4

General Permits

A.R.S. § 49-245

A.A.C. R18-9-E302 through R18-9-E323

42

53

952

Complex Combined

Four or more Type 4

General Permits

A.R.S. § 49-245

A.A.C. R18-9-E302 through R18-9-E323

42

94

1362

SUBDIVISION APPROVALS

Subdivision

Individual facilities

A.R.S. § 49-104(B)(11) A.A.C. R18-5-408

21

46

67

Subdivision

Community facilities

A.R.S. § 49-104(B)(11) A.A.C. R18-5-403

21

37

58

RECLAIMED WATER PERMITS

Individual Permit

No public hearing

Public hearing

A.R.S. § 49-203

A.A.C. R18-9-702 through R18-9-707

35

35

186

2311

221

266

Complex Individual Permit

No public hearing

Public hearing

A.R.S. § 49-203

A.A.C. R18-9-702 through A.A.C. R18-9-707

35

35

249

2941

284

329

Type 3 General Permit

A.R.S. § 49-203 A.A.C. R18-9-717, R18-9-718, R18-9-719

21

60

81

ARIZONA POLLUTANT DISCHARGE ELIMINATION SYSTEM (AZPDES) PERMITS

Individual Permit

Major Facility5

No public hearing

Public hearing

A.R.S. § 49-255.01

18 A.A.C. 9, Article 9, Part B

35

35

249

2941

284 3, 4

3293, 4

Individual Permit

Minor Facility6

No public hearing

Public hearing

A.R.S. § 49-255.01

18 A.A.C. 9, Article 9, Part B

35

35

186

2311

2213, 4

2663, 4

Individual Permit

Stormwater / Construction Activities

No public hearing

Public hearing

A.R.S. § 49-255.01

18 A.A.C. 9, Article 9, Part B

35

35

126

1711

161

2063, 4

Individual Permit

Major Modification

No public hearing

Public hearing

A.R.S. § 49-255.01

18 A.A.C. 9, Article 9, Part B

35

35

186

2311

2213, 4

2663, 4

LAND APPLICATION OF BIOSOLIDS REGISTRATIONS

Biosolids Applicator

Registration Request

Acknowledgment

A.R.S. § 49-255.03

A.A.C. R18-9-1004

15

0

15

UNDERGROUND INJECTION CONTROL PERMITS

Area Permit and Modification

No public hearing

Public hearing

A.R.S. §§ 49-203, 49-257.01

A.A.C. R18-9-C624

35

35

249

2941

284

329

Class I Well Permit and Modification

No public hearing

Public hearing

A.R.S. §§ 49-203, 49-257.01

A.A.C. R18-9-C616

18 A.A.C. 9, Article 6, Part E

35

35

249

2941

284

329

Class II Well Permit and Modification

No public hearing

Public hearing

A.R.S. §§ 49-203, 49-257.01

A.A.C. R18-9-C616

18 A.A.C. 9, Article 6, Part F

35

35

186

2311

221

266

Class III Well Permit and Modification

No public hearing

Public hearing

A.R.S. §§ 49-203, 49-257.01

A.A.C. R18-9-C616

18 A.A.C. 9, Article 6, Part G

35

35

186

2311

221

266

Class V Well Individual Permit and Modification

No public hearing

Public hearing

A.R.S. §§ 49-203, 49-257.01

A.A.C. R18-9-C616

18 A.A.C. 9, Article 6, Part I

35

35

186

2311

221

266

Class VI Well Permit and Modification

No public hearing

Public hearing

A.R.S. §§ 49-203, 49-257.01

A.A.C. R18-9-C616

18 A.A.C. 9, Article 6, Part J

35

35

249

2941

284

329

1 A request for a public hearing allows the Department 60 days to publish the notice of public hearing and for the official comment period. Forty-five business days are added to the substantive review time-frame.

2 Each request for an alternative design, installation, or operational feature under R18-9-A312(G) to a Type 4 General Permit adds eight business days to the substantive review time-frame.

3 EPA reserves the right, under 40 CFR 123.44, to take 90 days to supply specific grounds for objection to a draft or proposed permit when a general objection is filed within the review period. The first 30 days run concurrently with the Department's official comment period. Forty-five business days will be added to the substantive review time-frame to allow for the EPA review.

4 If a request for a variance is submitted to the Department, 40 CFR 124.62 requires that specific variances are subject to review by EPA. Under 40 CFR 123.44, EPA reserves the right to take 90-days to approve or deny the variance. Sixty-four business days will be added to the substantive review time-frame to allow for the EPA review.

5 "Major facility" means any NPDES "facility or activity" classified as such by the EPA in conjunction with the Director.

6 "Minor facility" means any facility that is not classified as a major facility.

Ariz. Admin. Code tit. 18, ch. 1, art. 5, Table 10

Table 10 adopted by final rulemaking at 5 A.A.R. 3343, effective August 13, 1999 (Supp. 99-3). Table repealed; new Table made by final rulemaking at 9 A.A.R. 241, effective March 11, 2003 (Supp. 03-1). Table amended by final rulemaking at 13 A.A.R. 1854, effective June 30, 2007 (Supp. 07-2). Amended by final rulemaking at 28 A.A.R. 1801, effective 9/6/2022.