Section R12-7-150 - Capacity Tests of Gas Wells and Geothermal WellsA. The operator of a producing gas well shall determine its open-flow capacity within 30 days following completion. Additional tests shall be taken as requested by the Commission. When a pipeline connection is available, gas wells shall not be tested by open-flow method, but the open-flow capacity shall be determined by the multipoint or single-point back-pressure test method.B. The Commission may require tests to determine the quantity and quality of geothermal resources or reservoir energy.C. The results of the tests required in this Section shall be reported in writing to the Commission within 15 days after the completion of the test.Ariz. Admin. Code § R12-7-150