Embankment Loading Condition | Minimum Factor of Safety |
End of construction case - upstream and downstream slopes | 1.3 |
End of construction case for embankments greater than 50 feet in height on weak foundations | 1.4 |
Steady state seepage - upstream (critical partial pool) and downstream slope (full pool) | 1.5 |
Instantaneous drawdown - upstream slope | 1.2 |
1 Not applicable to an embankment on a clay shale foundation.