Section R12-15-1211 - Application to Construct, Reconstruct, Repair, Enlarge, Alter, Breach, or Remove a Very Low Hazard Potential DamA. An application package to construct, reconstruct, repair, enlarge, or alter a very low hazard potential dam shall include the following prepared by an engineer or a person under the supervision of an engineer as defined in R12-15-1202(11): 1. A completed application filed in duplicate on forms provided by the Director that contains the following information: a. The name and address of the owner of the dam or the agent of the owner.b. The location, type, size, and height of the proposed dam and appurtenant works.c. The storage capacity of the reservoir associated with the proposed dam.d. The proposed time for beginning and completing construction.e. A description of the use for the impounded or diverted water and proof of a right to impound that water.2. The means, plans, and specifications by which the stream or body of water is to be dammed, by-passed, or controlled during construction.3. Maps, drawings, and specifications of the proposed dam.4. An initial application fee based on the total estimated project cost and computed in accordance with A.R.S. § 45-1204 and R12-15-104(A)(7).5. A detailed estimate of project costs. Project costs are all costs associated with construction of the dam and appurtenant works, including preliminary investigations and surveys, engineering design, supervision of construction, and any other engineering costs.6. A statement by the responsible engineer that classifies the dam as very low hazard in accordance with R12-15-1206(B). The responsible engineer shall submit a map of the area that would be inundated by failure or improper operation of the dam. The responsible engineer shall demonstrate that failure or improper operation would be unlikely to result in: a. Loss of human life. The demonstration may be based on an emergency action plan for persons who may be in the area of inundation;b. Significant incremental adverse consequences; orc. Significant intangible losses, as defined in R12-15-1202(21) and identified and evaluated by a public natural resource management protection agency, because the dam has a size classification of either small or intermediate under R12-15-1206(A) and any release would be limited to the 100 year floodplain or property owned or controlled by the dam owner under long-term lease.7. The seal and signature of the responsible engineer in accordance with A.R.S. Title 32, Chapter 1.8. The drawings required by subsection (A)(3) shall include a plan view and maximum section of the dam; the outlet works; and the spillway plan, profile, and cross section.9. The specifications required by subsection (A)(3) shall include the construction materials, testing criteria, and installation techniques.B. The Director may make other requirements for drawings and specifications for the proposed repair or alteration of a very low hazard potential dam. In determining other requirements, the Director shall consider the size and extent of the repair or alteration, the portions of the dam that will be repaired or altered, and whether the requirements elicit a description of the proposed construction work that is adequate to allow the Director to evaluate the repair or alteration.C. An owner intending to breach, remove, or reduce a very low hazard potential dam to nonjurisdictional size shall submit written notice to the Director at least 60 days before the date that construction begins.D. After receipt of a complete application package as prescribed by subsection (A), the Director shall either:1. Determine that the dam falls within the very low hazard classification and approve the application in writing; or2. Issue a written notice that the dam does not fall within the very low hazard classification.E. The Director's determination that the proposed dam does not fall within the very low hazard classification is an appealable agency action and subject to administrative and judicial review under A.R.S. Title 41, Chapter 6, Article 10.F. Upon completion of construction, the owner shall notify the Department in writing. The owner shall not use the dam and reservoir before receipt of a license unless the Director issues written approval.G. Within 90 days after completion of the construction, reconstruction, repair, enlargement, or alteration of a very low hazard potential dam, the owner shall file the following:1. An affidavit showing the actual cost of construction, reconstruction, repair, enlargement, or alteration of the dam. The owner shall submit a detailed accounting of the costs, including all engineering costs.2. An additional fee or refund request computed in accordance with A.R.S. § 45-1209 and R12-15-104(A)(7), based on the actual cost of construction, reconstruction, repair, enlargement, or alteration.3. A brief completion report summarizing the salient features of the project, including a description of the causes for any changes or deviations from the approved application package prepared by the engineer who supervised the construction in accordance with A.R.S. Title 32, Chapter 1. The report shall include: a. That the dam has been designed and constructed in compliance with basic principles of dam construction currently being practiced in the industry;b. That the dam as constructed has structural integrity and flood routing capacity consistent with its hazard potential classification; andc. That the as constructed drawings and the report accurately represent the construction of the dam.4. As constructed drawings prepared by the engineer who supervised the construction. The owner and the engineer shall maintain a record of the drawings.H. Within 30 days after receipt of the information in subsection (G), the Director shall issue to the owner either a license or a notice that the dam and appurtenant works shall not be operated because the dam and appurtenant works do not qualify as very low hazard or were not built according to the submitted design. Upon receiving the Director's written approval, the owner may operate the dam and appurtenant works. The license shall include conditions of operation, including: 1. The safe storage level of the reservoir,2. A requirement that the conditions resulting in the very low hazard classification be maintained throughout the life of the dam, and3. A requirement that the owner demonstrate in writing the very low hazard classification in the manner prescribed by subsection (A)(6) every five years.I. An owner shall immediately commence repairs necessary to safeguard human life and property and prevent failure or improper operation of a very low hazard potential dam. The owner shall notify the Department as soon as reasonably possible and in all cases within 10 days of commencing the required repairs.J. The Department may periodically inspect construction to confirm that it is proceeding according to the approved design and that proper construction quality assurance is being exercised by the owner's engineer. The owner, or the owner's engineer under the direction of the owner, shall remedy any unsatisfactory condition using the contractor.K. The owner shall provide the Department access to the dam site for purposes of inspecting all phases of construction, including the foundation, embankment and concrete placement, inspection and test records, and mechanical installations.Ariz. Admin. Code § R12-15-1211
New Section adopted by final rulemaking at 6 A.A.R. 2558, effective June 12, 2000 (Supp. 00-2). Amended by exempt rulemaking at 16 A.A.R. 1205, effective June 15, 2010 (Supp. 10-2). Amended by exempt rulemaking at 16 A.A.R. 1950, effective September 10, 2010 (Supp. 10-3). Amended by final rulemaking at 17 A.A.R. 659, effective June 4, 2011 (Supp. 11-2).