Current through Register Vol. 31, No. 2, January 10, 2025
Section R11-3-704 - Redistribution of SoilBefore redistributing a stockpile of soil conserved under R11-3-703, the responsible party shall:
1. Treat the area of disturbance as necessary to reduce potential for slippage of the redistributed soil or to enhance root penetration, and2. Take steps to redistribute the soil in a manner that:a. Prevents excess compaction, andb. Achieves a thickness consistent with the approved post-aggregate mining land use.Ariz. Admin. Code § R11-3-704
Adopted by final rulemaking at 25 A.A.R. 828, effective 5/11/2019.