Section 5 AAC 40.830 - Hatchery inspection

The permit holder shall notify the PNP coordinator when construction of the hatchery has been completed and the facility is ready for operation. The facility must be inspected and approved by the department before the permit holder may start operations.

5 AAC 40.830

Eff. 3/31/85, Register 93

Authority:AS 16.05.020

AS 16.05.092

AS 16.10.400

AS 16.10.460