Section 5 AAC 34.055 - Permits for processing vesselsThe owner or operator of a vessel used in the processing of king crab must obtain a permit from the department before starting processing operations. The permit must contain the following requirements:
(1) reporting of vessel location to the department;(2) reporting of harvesting or processing operations to the department;(3) reporting of unloading and transport operations to the department;(4) permission for local representatives of the department to inspect, at any time, the vessel's holds, live tanks, freezers, processing areas, and processed and unprocessed king crab; and(5) reporting of any other information required by the department for the conservation and development of king crab resources.Eff. 7/25/82, Register 83; am 6/30/83, Register 86Authority:AS 16.05.251