Current through October 17, 2024
Section 3 AAC 48.468 - Rejection, suspension, notice, and effective date(a) In accordance with 3 AAC 48.310, the commission may reject a simplified pipeline tariff that does not meet the requirements of 3 AAC 48.450 - 3 AAC 48.490.(b) A simplified pipeline tariff meeting the requirements of 3 AAC 48.450 - 3 AAC 48.490 will be noticed to the public in accordance with 3 AAC 48.220 and 3 AAC 48.280. A petition to declare the pipeline facility a designated pipeline facility eligible to operate under a simplified pipeline tariff will be noticed to the public as part of the simplified pipeline tariff filing.(c) Except as provided in 3 AAC 48.474(b), simplified pipeline tariff rules under 3 AAC 48.462 or rates filed under 3 AAC 48.464 are effective on the 91st day after filing unless (1) the commission suspends the simplified pipeline tariff filing and opens an investigation into the filing; or(2) upon request by the applicant for good cause shown the commission determines to shorten the period before which the tariff rules, rates, or both become effective.(d) A simplified pipeline tariff filed under 3 AAC 48.454(a) takes effect on the date of the commission order granting the petition requesting designated pipeline facility status.Eff. 1/9/2009, Register 189; am 10/27/2017,Register 224, January 2018Authority:AS 42.04.080
AS 42.06.055
AS 42.06.140
AS 42.06.350
AS 42.06.400