Current through October 17, 2024
Section 3 AAC 305.080 - Petition for licenses(a) If required by AS 04.11.460, a petition is a necessary part of an application. All petitions must be on forms prescribed by the board. Petition signatures must be obtained within the 90-day period immediately preceding the submission of the application. However, signatures may be added to the petition before an application has been deemed complete.(b) A person signing a petition relating to a license must be 21 years of age or older and a permanent resident of the geographical area relevant to the petition. A person may have only one permanent residence. Municipal boundaries shall be disregarded when gathering petition signatures.(c) When submitting a petition under AS 04.11.460, an applicant shall assist in the determination of population by submitting the following information with the application:(1) a graphic designation on a United States Geodetic Survey map with a scale of at least one inch to the mile showing the population within a circle of the applicable radius, and showing where petition signatures were obtained; and(2) the population within the applicable area and narrative of how the population was determined.Eff. 1/1/2024, Register 248, January 2024Authority:AS 04.06.005
AS 04.06.100
AS 04.11.460