3 Alaska Admin. Code § 107.775

Current through October 17, 2024
Section 3 AAC 107.775 - Additional information from applicant
(a) The authority may require the applicant or grantee to provide additional information which the authority considers necessary or desirable to complete review of an abstract, a full proposal, or during project operation and maintenance reporting required under 3 AAC 107.790. The authority may require the additional information and at any stage in the review, evaluation, or award process. Required additional information may include information sufficient for the authority to confirm that
(1) an application meets the requirements for abstracts and full proposals; or
(2) an applicant or grantee is willing and able to adjust the project scope and budget as required by the authority in awarding a grant.
(b) If an applicant or grantee fails to provide timely or adequate information required by the authority, the authority may reject the abstract or full proposal, modify the grant award, or cancel an award of a grant.

3 AAC 107.775

Eff. 1/26/2012, Register 201

Authority:AS 42.45.375

AS 44.83.080