A permit issued to any aquaculture facility must include as a condition compliance with the applicable requirements set out in 40 C.F.R. 122.25 and 40 C.F.R. 125.10- 40 C.F.R. 125.11, adopted by reference in 18 AAC 83.010.
18 AAC 83.625
Authority:AS 44.46.020
AS 46.03.010
AS 46.03.020
AS 46.03.050
AS 46.03.100
AS 46.03.110