Current through October 17, 2024
Section 18 AAC 75.563 - Minimum registration standards for response planning facilitators(a) As applicable under 18 AAC 75.428(a) (2), a response planning facilitator shall maintain contracts with or membership in the streamlined plan cleanup contractors and incident management teams identified in 18 AAC 75.533(3) - (5).(b) Professional response action standards and practices must be maintained, and must include (1) remaining in substantial compliance with applicable contracts;(2) maintaining a working knowledge of all applicable oil pollution statutes and regulations and pertinent provisions of each streamlined plan plan in which the response planning facilitator is listed;(3) maintaining a safe working environment and an acceptable safety history; and(4) notifying a plan holder and the department within 24 hours after any significant change in the response planning facilitator's ability to carry out its responsibilities under 18 AAC 75.428.(c) Not later than January 31 of each year, a response planning facilitator registered under this chapter shall provide to the department a complete list of streamlined plan in which that contractor has agreed in writing to be listed as a response planning facilitator, and shall identify on that list the role of the response planning facilitator with regard to each plan as described in 18 AAC 75.428(a) (1) or (2) for. (2) noncrude oil tank vessels and baitjcs that have a storage capacity of less than 500 barrels. Eff. 11/27/2002, Register 164; am 11/7/2020, Register 236, January 2021; am 11/7/2020, Register 236, January 2021Authority:AS 46.03.020
AS 46.04.030
AS 46.04.035
AS 46.04.055
AS 46.04.070