INDIVIDUAL PERMIT FEES1 | |
Fee (in dollars) | |
(1) Annual fee for a domestic wastewater system covered under a general permit, with a daily maximum permitted flow, in gallons per day (gpd), of | |
(A) 0 - 100,000 | 655 |
(B) 100,001 - and over | 7,920 |
(2) Annual fee for power generation cooling water discharge by a facility | 6,520 |
(3) Annual fee for seafood processing that is not covered under the general permit | 7,040 |
(4) One-time fee for seafood processor modifications within the same year | 325 |
(5) One-time application fee for certification under 33 U.S.C. 1341 of a "dredge-or-fill" permit issued under 33 U.S.C. 1344 (Clean Water Act, sec. 404), for2 | |
(A) Airport project | 320 |
(B) Other projects or department activities as follows: | |
(i) waiver of certification under 33 U.S.C. 1341 | 130 |
(ii) project disturbing less than one acre | 600 |
(iii) project disturbing 1 - 5 acres | 765 |
(iv) project disturbing 5.01 to 20 acres | 1,160 |
(v) project disturbing greater than 20 acres | 2,375 |
(6) Annual fee for harbor dredge projects | 1,080 |
(7) Annual fee for individual permit for a municipal separate storm sewer system (MS4) | 9,115 |
(8) Annual fee for bulk fuel and small oil terminals with only a few low-volume discharges | 6,490 |
Notes to table:
1 If the applicant is a business with fewer than 20 employees, the fee is reduced by a travel cost of $85.
2 Mine projects and pipelines eight inches or greater in diameter are subjected to a fee as described in 18 AAC 72.959.
18 AAC 72.957
Authority:AS 37.10.052
AS 44.46.020
AS 44.46.025
AS 46.03.020
AS 46.03.050
AS 46.03.100
AS 46.03.110
AS 46.03.710