18 Alaska Admin. Code § 71.090

Current through October 17, 2024
Section 18 AAC 71.090 - Remedies

If a grantee fails to comply with any provision of AS 46.16.010-46.16.100, this chapter, or the grant agreement, the department will, in its discretion, withhold payments and recover previous payments by any legal means. Success of a project in demonstrating innovative methods of gold recovery, water pollution control, water use reduction, or waste disposal is not a factor in grant payment if the grantee has shown good faith in carrying out the project.

18 AAC 71.090

Eff. 2/3/85, Register 93

Authority:AS 27.05.010

AS 46.03.020(10)

AS 46.16.060