18 Alaska Admin. Code § 60.203

Current through October 17, 2024
Section 18 AAC 60.203 - Design approval

For facilities that require a permit or authorization under 18 AAC 60.200 or 18 AAC 60.211, the owner of the facility must have prior written approval from the department of the facility design in order to construct a new facility or a lateral expansion of an existing facility. Drawings, documents, and plans showing that the facility design will meet the applicable requirements of this chapter may be submitted for department approval either separately or as part of a permit application.

18 AAC 60.203

Eff. 4/12/2013, Register 206

Authority:AS 46.03.010

AS 46.03.020

AS 46.03.100

AS 46.03.710

AS 46.06.080