Section 18 AAC 34.205 - Permit requirements(a) Shellfish may be processed only in a land-based or dockside facility and only by a person who has a current annual permit issued by the department.(b) Except for a shellfish harvester, a shellfish permit applicant shall meet the requirements of 18 AAC 34.035 - 18 AAC 34.060 and pay the permit fee required by 18 AAC 34.900.(c) A shellfish harvester permit applicant shall submit to the department(1) the fee required at 18 AAC 34.900;(2) a completed form provided by the department;(3) an example of the actual shellfish tag to be used by the harvester as required by 21 C.F.R. 123.28, adopted by reference in 18 AAC 34.010;(4) a map and description of the location of the shellfish growing area;(5) a list of potential contaminants, including sewage, industrial waste, pesticide chemicals, and radionuclides, to which the shellfish might reasonably be expected to be exposed; and(6) the following information, if the harvest activity includes establishment of a shellfish harvesting residential campsite:(A) a copy of the lease agreement with the owner of the area that will be used as a campsite;(B) a description of the exact location of the campsite;(C) the length of time the campsite will be used.Eff. 12/18/97, Register 144; am 12/2/99, Register 152Authority:AS 17.20.005
AS 17.20.065
AS 17.20.072
AS 17.20.180
AS 44.46.020