Current through October 17, 2024
Section 18 AAC 32.030 - General operating and permit requirements(a) A person described in 18 AAC 32.010(b) may not conduct an activity described in 18 AAC 32.010(a) or (b) unless (1) the person has a current permit issued by the department under this section; and(2) the department has confirmed compliance with this chapter by inspections conducted as provided in the PMO.(b) An applicant shall apply for a permit, using a form supplied by the department. If the application is for a facility in which an activity described in 18 AAC 32.010(b) (1) or (b)(3) occurs, the application must include a facility plan, including a plot plan, of the entire premises; the facility plan must meet the requirements of the PMO and must include (1) the location of buildings and property boundaries;(2) a plumbing schematic that shows hot and cold potable water lines and nonpotable water lines;(3) a floor plan with the specifications of the finish materials used for floors, walls, and ceilings; and(4) proof that the facility's (A) drinking water supply and treatment complies with 18 AAC 80;(B) wastewater disposal complies with 18 AAC 72; and(C) solid waste disposal complies with 18 AAC 60.(c) The department will, in its discretion, request additional information before issuing a permit.(d) If the department issues a permit under this section, it will assign a permit number to the facility or milk hauler.(e) A permit issued under this section does not expire. The permit (1) may not be transferred from one owner, operator, or facility to another; and(2) is subject to the suspension, revocation, and reinstatement provisions of section 3 of the PMO.(f) If the owner or operator of a facility required by this section to have a permit changes, or if the location of a facility required by this section to have a permit changes, the owner or operator of the facility shall submit a new permit application and obtain a permit.Eff. 5/23/98, Register 146Authority:AS 03.05.011
AS 03.05.020
AS 44.46.020