Where unforeseen circumstances arise during construction on a department right-of-way that require an immediate relocation of a utility facility, the department will, in its discretion, require the immediate relocation of the facility, notwithstanding the terms of any existing utility permit or relocation agreement.
17 AAC 15.461
Authority:AS 02.15.020
AS 02.15.102
AS 02.15.106
AS 19.05.020
AS 19.05.040
AS 19.30.051
AS 19.30.121
AS 19.40.065
AS 35.05.020
AS 35.10.210
AS 35.10.230