Current through October 17, 2024
Section 17 AAC 15.101 - Permits for utility service connections(a) The department will require an amendment to an existing utility permit or new permit for all utility service connections subsequent to the issuance of the original permit for the distribution, collection, or feeder line facility.(b) The department may allow a permittee to install additional service connections within a department right-of-way where a longitudinal underground, surface, or overhead distribution or feeder line has been installed under a utility permit. The department will amend the utility permit to include the additional service connections.(c) New permits are required for underground utility service connections which cross a department right-of-way and which originate from distribution lines located outside the right-of-way.Eff. 5/23/82, Register 82; am 7/15/2009, Register 191Authority:AS 02.15.020
AS 02.15.102
AS 02.15.106
AS 19.05.020
AS 19.05.040
AS 19.25.010
AS 19.25.200
AS 19.30.121
AS 19.40.065
AS 35.05.020
AS 35.10.210
AS 35.10.230
AS 44.42.020
AS 44.42.030