The grantee shall repay to the Corporation any costs determined not to be allowable as a result of any findings or questioned costs identified in the audits required by 15 AAC 154.740 or as a result of any grant monitoring activities of the Corporation under 15 AAC 154.805. Repayment by the grantee of grant funds under this recovery provision shall occur within 30 days of demand.
15 AAC 154.785
Authority:AS 18.55.100
AS 18.56.088