Section 13 AAC 69.020 - Interport differential criteriaThe aggregate of the following cost criteria comprise the interport differential for a bid submitted by a shipyard facility:
(1) fuel to transport the vessel from its designated base port to the shipyard facility and return;(2) maintenance costs incurred and consumables used, including lubricants and other engine and deck stores, while transporting the vessel from its designated base port to the shipyard facility and return;(3) crew wages (A) to prepare the vessel for entry to the shipyard facility;(B) to deliver the vessel from its designated base port to the shipyard facility and return; and(C) for crew that are assigned to travel to or from the vessel while it is in the shipyard facility;(4) nonwage costs to transport crew to or from the vessel while it is in the shipyard facility;(5) crew per diem while the vessel is in the shipyard facility;(6) travel costs and per diem for non-crew staff and consultants to administer the contract;(7) other interport costs not described in (1) - (6) of this section that relate to the performance of the maintenance or repair work of a vessel at a shipyard facility.Eff. 8/12/99, Register 151