Ala. Admin. Code r. 880-X-8I-.05

Current through Register Vol. 43, No. 1, October 31, 2024
Section 880-X-8I-.05 - Operation Plan: General Requirements

Each application shall contain a description of the surface operations to be conducted within the proposed permit area, including, at a minimum, the following:

(a) A description of the methods, of procedures and proposed engineering techniques and the major equipment to be used for all aspects of those operations.
(b) A description of the sequence and timing of the disturbing of sub-areas (shown on the permit map as required in Rule 880-X-8I-.07 ) of the permit area for which individual bonds will be obtained, over the total life of the proposed permit.
(c) A narrative explaining the construction, modification, use, maintenance, and removal of the following facilities (unless retention of such facilities is necessary for postmining land use as specified in Rule 880-X-10D-.64 ) --
1. Coal removal, handling, storage, cleaning, and transportation structures and facilities;
2. Spoil, coal processing waste, and non-coal waste removal, handling, storage, transportation, and disposal structures and facilities.
3. Mine facilities; and
4. Water pollution control facilities.

Author:

Ala. Admin. Code r. 880-X-8I-.05

Statutory Authority:Code of Ala. 1975, §§ 9-16-71, 73, 74, 75, 80, 81, 82, 83, 84, 85, 86, 88, 90, 91, 92, 96.