Current through Register Vol. 43, No. 02, November 27, 2024
Section 880-X-3A-.04 - Applicability(1) The requirements of this Chapter apply to surface coal mining and reclamation operations validly permitted under the interim program until eight months after the date of approval of the State Regulatory Program.(2) The requirements of this Chapter apply to surface coal mining and reclamation operations validly permitted under the interim program (for which the permittee has submitted a permit application within two months of the date of approval of the State Regulatory Program) until such time as a decision is rendered on the permit application.(3) All reclamation provisions shall apply until complete bond release.
Author:
Ala. Admin. Code r. 880-X-3A-.04
Statutory Authority:Code of Ala. 1975, §§ 9-16-71, 72, 73, 74, 75, 80, 81, 82.