When rills or gullies deeper than 9 inches form in areas that have been regraded and topsoiled, the rills and gullies shall be filled, graded, or otherwise stabilized and the area reseeded or replanted according to Rules 880-X-10D-.52 - 880-X-10D-.57. The State Regulatory Authority shall specify that rills or gullies of lesser size be stabilized and the area reseeded or replanted if the rills or gullies are disruptive to the approved postmining land use or may result in additional erosion and sedimentation.
Author:
Ala. Admin. Code r. 880-X-10D-.51
Statutory Authority:Code of Ala. 1975, §§ 9-16-71, 72, 73, 74, 75, 76, 80, 81, 82, 83, 84, 89, 90, 91, 97.