Section 480-3-3-.10 - Hoisting Signal Code

The following code of signals shall be used for the operation of hoists. (All signals used for hoisting of men shall be acknowledged by the hoisting engineer before men may enter the shaft or slope conveyance.)

1 ring--stop

2 rings--hoist

3 rings--lower

4 rings-- hoist slowly

5 rings -- lower slowly

8 rings -- man on skip, cage or trip followed by hoist slowly or lower slowly signals after men have entered cage, skip or trip.

Author: Marcus Davis, Workers' Compensation Examiner.

Ala. Admin. Code r. 480-3-3-.10

Statutory Authority: Code of Ala. 1975, § 25-2-13(2).