Current through Register Vol. 43, No. 1, October 31, 2024
Section 420-3-6-.08 - Professionals Required(1) The applicant shall employ an engineer to complete the following requirements in this rule: (a)420-3-6-.09(2)(d) - Septage management plan.(b)420-3-6-.09(2)(g) - Protective measures.(c)420-3-6-.10(1) - Plat map.(d)420-3-6-.10(3) - Vicinity map.(e)420-3-6-.12 - Storage tank requirements.(2) The applicant shall employ a soil classifier to complete the requirements of Rule 420-3-6-.10(2) High Intensity Soil Map.(3) The applicant shall employ a certified crop advisor to complete the requirements of Rule 420-3-6-.11 Annual Crop Management Plan.(4) The applicant shall employ a hydrogeologist to complete the requirements of the following: (a) Rule 420-3-6-.10(4) - Hydrogeological report.(b) Rule 420-3-6-.14(4) - Contamination sources.(5) All submittals by professionals shall contain the appropriate signatures and seals as required by the appropriate licensing board.(6) Subsequent applications for permit renewal may be signed and submitted by the applicant, except for the updated annual crop management plan as required in Rule 420-3-6-.11, provided that no significant changes have occurred to the facility or the operation.Ala. Admin. Code r. 420-3-6-.08
Filed: September 20, 1989. Repealed. Filed: November 19, 1991. New Rule: Filed: October 20, 1994; effective November 24, 1994.Adopted by Alabama Administrative Monthly Volume XXXIX, Issue No. 03, December 31, 2020, eff. 2/14/2021.Original Rule .08 was renumbered .09 and a new .08 was added per certification published December 31, 2020; effective February 14, 2021.
Author: Thad Pittman
Statutory Authority:Code of Ala. 1975, §§ 22-2-2(6), 22-10-1 et seq., 22-20-5, 22-26-1, 22-26-2, 22-26-3.