Current through Register Vol. 43, No. 02, November 27, 2024
Section 420-3-11-.17 - Review Of Plans(1) Submission of Plans (a) Whenever a hotel is constructed or extensively remodeled and whenever an existing structure is converted to use as a hotel, properly prepared plans and specifications for such construction, remodeling, or conversion shall be submitted to the Health Officer for review and approval before construction, remodeling or conversion is begun. The plans and specifications shall indicate the proposed layout, arrangement, mechanical plans, and construction materials of equipment and facilities. Plans shall also be submitted to the State Building Commission in accordance with Title 41, Chapter 9, Code of Ala. 1975.(b) The Health Officer shall approve the plans and specifications if they meet the requirements of these rules. No hotel shall be constructed, remodeled, or converted except in accordance with the plans and specifications approved by the Health Officer. Plans shall be reviewed and action taken within twenty working days after receipt.(c) Confidential material submitted to the Health Officer must be treated in accordance with the provisions of Title 36-12-40.(2) Preoperational Inspection - Whenever plans and specifications are required by Rule 420-3-11-.17 to be submitted to the Health Officer, the Health Officer shall inspect the proposed hotel prior to the start of operations or within five working days after a written request is made to determine compliance with the approved plans and specifications and with the requirements of these rules. Authors: Ronald Dawsey, Tim Hatch
Ala. Admin. Code r. 420-3-11-.17
Filed September 1, 1982. Repealed and Replaced: Effective March 26, 1993. Amended: December 20, 2006; effective January 24, 2007. Rule was renumbered to 420-3-11-.17 as per certification filed December 20, 2006; effective January 24, 2007.
Statutory Authority:Code of Ala. 1975, §§ 22-2-2, 34-15-3.