Ala. Admin. Code r. 420-3-1-.12

Current through Register Vol. 43, No. 1, October 31, 2024
Section 420-3-1-.12 - Requirements For All Permit Applications
(1) An application for a new permit or reissuance of an existing permit shall be submitted using the following forms designated by ADPH:
(a) ADPH Form CEP-2 is used to apply for a Permit to Install for Small-Flow developments and individual Small-Flow Systems in a Large-Flow Development.
(b) The ADPH Form CEP-3, Section A is used for Large-Flow Developments, and ADPH Form CEP-3, Section Bis used for Large-Flow Systems.
(c) ADPH Form CEP-3, Section C, is used for performance permits.
(d) ADPH Form CEP-11 is used to apply for a Pre-made. Septic Tank, Grease Trap, and Holding Tank permit.
(e) ADPH Form CEP-13 is used to apply for a proprietary product permit.
(2) All applications are subject to 420-3-1-.13 Time Limitations and Permitting Actions.
(3) ADPH or the LHD may assess a fee where fee authorization exists.

Ala. Admin. Code r. 420-3-1-.12

Filed July 20, 1988. Amended: Filed June 19, 1992. Repealed and New Rule: Filed December 16, 1999; effective January 20, 2000. Repealed and New Rule: October 20, 2005; effective November 24, 2005; operative March 19, 2006. Amended: Filed October 19, 2006; effective November 23, 2006.
Adopted by Alabama Administrative Monthly Volume XXXV, Issue No. 04, January 31, 2017, eff. 3/5/2017.
Adopted by Alabama Administrative Monthly Volume XLI, Issue No. 03, December 30, 2022, eff. 2/13/2023.

Previous Rule .11 was renumbered .12 per certification published December 30, 2022; effective February 13, 2023.

Authors: Thad Pittman, Matthew Conner, Ken Stephens, Bob Bright

Statutory Authority:Code of Ala. 1975, §§ 22-2-2(4); 22-2-2(6); 22-10-1, et seq.; 22-26-1et seq; 22-25B-1, et seq.