Ala. Admin. Code r. 400-6-6-.01

Current through Register Vol. 43, No. 1, October 31, 2024
Section 400-6-6-.01 - Volume Verification
(1) Prior to injecting gas into the storage cavity, the capacity of the storage cavity shall be verified utilizing a sonar survey or other method approved by the Supervisor. The Supervisor shall be notified at least forty-eight (48) hours prior to conducting any test or surveys to verify capacity. Copies of such tests or surveys shall be filed with the Board within thirty (30) days after such tests or surveys are conducted.
(2) In the event the operator of a storage facility recalculates the capacity of the actual storage cavern volume determined after continued operation of the facility, then the operator shall submit the redetermination to the Supervisor. Requirements outlined in Rule 400-6-7-.01.

Author: State Oil And Gas Board

Ala. Admin. Code r. 400-6-6-.01

New Rule: Filed April 11, 2000; effective May 16, 2000.

Statutory Authority:Code of Ala. 1975, §§ 9-17-1etseq.