Unless otherwise specified by the Supervisor, an operator completing a well in a new oil or gas pool(s) shall perform an initial bottom hole pressure survey on said pool(s) prior to receiving a temporary allowable from the Supervisor. The bottom hole pressure survey shall be performed with a bottom hole pressure gauge and results of the survey shall be reported to the Supervisor. The bottom hole pressure survey shall be conducted for at least twenty-four (24) hours and in accordance with industry standards.
Author: State Oil and Gas Board
Ala. Admin. Code r. 400-2-6-.03
Statutory Authority:Code of Ala. 1975, §§ 9-17-1, etseq.