Ala. Admin. Code r. 400-2-3-.03

Current through Register Vol. 43, No. 1, October 31, 2024
Section 400-2-3-.03 - Approval Of Activities
(1) An operator shall obtain approval of the Supervisor for:
(a) Initiating drilling, converting, or reentering a well, see Rule 400-2-2-.01(2);
(b) Deepening, see Rule 400-2-2-.01(4);
(c) Directionally drilling or sidetracking, see Rule 400-2-2-.01(5);
(d) Change of operator, see Rule 400-2-2-.05;
(e) Plan of abandonment of a radioactive logging source, see Rule 400-2-4-.05(3);
(f) Plan of operation for reentering, converting, recompleting, or reworking a well containing a radioactive logging source, see Rule 400-2-4-.05(7);
(g) Radioactive surveys, see Rule 400-2-4-.06;
(h) Chemical treatment or fracturing, see Rule 400-2-4-.07;
(i) Disposal of tank fluids, see Rule 400-2-4-.10;
(j) Plugging and abandonment, see Rule 400-2-4-.11;
(k) Clearance of location, see Rule 400-2-4-.13;
(l) Initial request for temporary abandoned or shut-in status, see Rule 400-2-4-.14;
(m) Production testing, see Rule 400-2-5-.03;
(n) Temporary test allowables, see Rule 400-2-5-.04;
(o) Multiple completions, see Rule 400-2-5-.05;
(p) Recompletion or reworking, see Rule 400-2-6-.06(1);
(q) Fluid used for testing production casing, see Rule 400-2-6-.08(1)(a);
(r) Maximum pressure limit for casing annuli, see Rule 400-2-6-.08(1)(a);
(s) Abnormal casing pressure, see Rule 400-2-6-.08(2);
(t) Platform or fixed structure design features or structural modifications thereto, see Rule 400-2-6-.09(2);
(u) Construction, and operation of a sour gas production facility, see Rule 400-2-6-.10(1);
(v) Design, construction, and operation of a processing facility, see Rule 400-2-6-.10(2);
(w) Design, construction, and operation of a plant and placing a plant into service, see Rule 400-2-6-.10(3);
(x) Modifications to sour gas production facilities, processing facilities, and plants, see Rule 400-2-6-.10(4);
(y) Activation of low-pressure sensors on pressure vessels that operate at less than five (5) pounds per square inch, see Rule 400-2-6-.10(5);
(z) Transportation of oil, gas, condensate, or plant products, see Rule 400-2-7-.01;
(aa) Operations involving hydrogen sulfide, see Rule 400-2-8-.04(8)(c);
(bb) Modification of existing hydrogen sulfide operations or facilities, see Rule 400-2-8-.04(8)(e);
(cc) Hydrogen sulfide monitoring system and test equipment prior to initial test production, see Rule 400-2-8-.04(f);
(dd) Transportation of wastes, see Rule 400-2-8-.05(1)(a); and
(ee) Modification of transportation of wastes procedures, see Rule 400-2-8-.05(1)(b).
(2)Witness of Activities. The Supervisor may send a duly authorized representative to the location to witness activities in section (1) above.

Author: State Oil and Gas Board

Ala. Admin. Code r. 400-2-3-.03

New Rule: Filed April 11, 2000; effective May 16, 2000.

Previous Chapter 400-2 (Rules 400-2-X-.01 through 400-2-X-.09) Repealed and New Chapters400-2-1 through 400-2-9adopted in lieu thereof: Filed April 11, 2000.

Statutory Authority:Code of Ala. 1975, §§ 9-17-1, etseq.