If required by this rule, a directional survey, which may include logging while drilling (LWD) or measurement while drilling (MWD) logs, shall be run and one (1) copy thereof filed by the operator with the Supervisor within thirty (30) days after completion of a well. Directional surveys shall be run from total depth to base of surface casing or the kickoff point, whichever is shallowest, unless otherwise approved by the Supervisor. However, directional surveys to total depth shall be unnecessary in cases where the interval below the survey is less than five hundred (500) feet. In such an instance, a projection of the latest survey shall satisfy Board requirements. In the event the proposed or final location of the producing interval of the directionally controlled well is not in accordance with spacing or other rules of the Board applicable to the reservoir, proper applications shall be made to obtain approval of exceptions to such rules. Such approval shall be granted, or denied, at the discretion of the Board, after notice and hearing. Directional surveys shall be run when:
Author: State Oil and Gas Board
Ala. Admin. Code r. 400-1-4-.04
Statutory Authority:Code of Ala. 1975, §§ 9-17-1, etseq.