Prior to commencing recompletion or reworking operations, approval shall be obtained from the Supervisor. All recompletion or reworking operations shall be conducted in a manner to ensure continuous control of the well. Adequate well control equipment and procedures shall be used to prevent uncontrolled release of methane, produced water, completion fluids or other material during recompletion or reworking operations. The method of well control may consist of conventional blow-out preventers, stripper heads, and other equipment or techniques, which provide for safe operations. Within thirty (30) days of recompletion or reworking operations, the operator shall submit a revised Form OGB-6, OGB-7, OGB-8, and OGB-9, where applicable, and one (1) copy of any additional logs.
Author: State Oil and Gas Board
Ala. Admin. Code r. 400-3-6-.05
Statutory Authority:Code of Ala. 1975, §§ 9-17-1, etseq.