Current through Register Vol. 43, No. 02, November 27, 2024
Section 390-X-9-.06 - [Effective 12/15/2024] Grant Application Requirements(1) Requests for grants from the Program shall be submitted to the Commission on application forms or in a format specified by the Commission.(2) Applications for grants from the Program must be submitted to the Commission no later than the deadlines established and published by the Commission to be considered for funding.(3) Rural bridge grant applications must include all of the following information:(a) Identification of federal, local and other funding sources to be used as matching funds to complete the proposed project;(b) A demonstration of how the proposed maintenance, repair, replacement, or construction of a public rural bridge will materially improve transportation access to forest products; and(c) A summary of the engineering and construction aspects of the proposed project, including an estimate of its cost and the time required for its completion.(4) Logging workforce development grant applications must include information demonstrating how proposals would materially advance, improve or support development of the logging workforce.(5) Logging technology grant applications must include information to demonstrate how proposals would advance research and implementation of technologies that improve forest product harvesting and transportation efficiencies.Ala. Admin. Code r. 390-X-9-.06
Adopted by Alabama Administrative Monthly Volume XLIII, Issue No. 01, October 31, 2024, eff. 12/15/2024.Author: Scott L. Rouse
Statutory Authority:Code of Ala. 1975, § 9-3-10.2(d)(1)