After bids have been received, the design professional shall check and tabulate all bids, certifying that the bids were received sealed, publicly opened and read aloud at the time and place advertised, and that it is a true and correct tabulation of all bids received for the project. This tabulation shall be signed by the design professional, notarized, and furnished to the awarding authority and the Technical Staff. If a bid is incomplete, qualified, or bears any condition or irregularity that may affect its responsiveness, the design professional shall note this information on the tabulation.
Ala. Admin. Code r. 355-15-1-.08
Author: Stedmann B. McCollough, Director
Statutory Authority:Code of Ala. 1975, § 41-9-141.