Ala. Admin. Code r. 335-6-3-.09

Current through Register Vol. 43, No. 1, October 31, 2024
Section 335-6-3-.09 - Engineer Inspection

Upon completion of construction of a waste treatment facility and upon request of the technical staff, the professional engineer who designed such facility or assumed responsibility for its design shall furnish said staff with a letter certifying that the facility has been constructed in accordance with the plans, specifications, modifications, and alterations reviewed by the technical staff.

Author:David Ludder

Ala. Admin. Code r. 335-6-3-.09

Effective: January 17, 1974. Amended: October 10, 1984.

Statutory Authority:Code of Ala. 1975, § § 22-22-9, 22-22A-5, 22-22A-6, 22-22A-8.