Solid waste management subject to this Division shall take place in a unit(s) permitted by the Department. Rules 335-13-5-.02 through 335-13-5-.07 establish the minimum requirements and procedures for obtaining a solid waste landfill permit, composting facility permit or CCR facility permit for existing and proposed facilities. The technical standards used to determine the requirements of a permit are set out in chapter 335-13-4 for landfills, 335-13-14 for composting facilities and 335-13-15 for CCR units.
Ala. Admin. Code r. 335-13-5-.01
Authors: Russell A. Kelly, Heather M. Jones
Statutory Authority:Code of Ala. 1975, §§ 22-22A-5, 22-27-3, 22-27-5, 22-27-7.