Ala. Admin. Code r. 335-13-3-.07

Current through Register Vol. 43, No. 02, November 27, 2024
Section 335-13-3-.07 - Closure Of Facilities
(1) No person shall close a registered facility without submitting written notification to the Department at least thirty (30) days in advance of the closure. Such written notification shall contain the following.
(a) Name, address and telephone number of the facility and of the location of the owner, operator, or responsible person following facility closure.
(b) Reason for closure to include factor(s) leading to the closure decision.
(c) Written plans for notifying the facility's customers of the closure. Such notification to customers shall include the placement of signs of suitable size at the entrance to the facility indicating the closure date of the facility and/or last date materials to be accepted, if different than the closing date. Such notification shall also include the location of the nearest available recycling and/or solid waste disposal facility.
(d) Plans and methods for the prevention of recyclable materials and other solid wastes to accumulate at the facility following closure, and the plans for disposition of such materials in compliance with applicable regulatory requirements.
(2) All solid waste and recyclable materials shall be properly removed from the facility prior to closure, potential nuisance conditions shall be addressed, and, if necessary, the site shall be stabilized to prevent migration of sediment off-site due to stormwater runoff.

Ala. Admin. Code r. 335-13-3-.07

Repealed: June 21, 1996; effective July 26, 1996. New Rule: Filed June 28, 2010; effective August 2, 2010.

Authors: Phillip D. Davis, M. Gavin Adams

Statutory Authority:Code of Ala. 1975, §§ 22-27-12, 22-27-15, 22-27-16.