[Note: A generator who treats, stores, or disposes of hazardous waste on-site must comply with the applicable standards and permit requirements set forth in Chapters 335-14-5, 335-14-6, 335-14-7, 335-14-8, and 335-14-9.]
Table 1
Generator Categories Based on Quantity of Waste Generated in a Calendar Month
Quantity of acute hazardous waste generated in a calendar month | Quantity of nonacute hazardous waste generated in a calendar month | Quantity of residues from a cleanup of acute hazardous waste generated in a calendar month | Generator category |
> 1 kg | Any amount | Any amount | Large quantity generator. |
Any amount | [GREATER THAN EQUAL TO] 1,000 kg | Any amount | Large quantity generator. |
Any amount | Any amount | >100 kg | Large quantity generator. |
[LESS THAN EQUAL TO] 1 kg | > 100 kg and < 1,000 kg | [LESS THAN EQUAL TO] 100 kg | Small quantity generator. |
[LESS THAN EQUAL TO] 1 kg | [LESS THAN EQUAL TO] 100 kg | [LESS THAN EQUAL TO] 100 kg | Very small quantity generator. |
[Note: EPA identification numbers are location specific and cannot be transferred from one individual generation site to another.]
[Note: If a generator notifies at a level higher than their actual generator status, the generator will be required to comply with all the applicable requirements of that higher generator classification. Alternatively, the generator has the option to submit multiple ADEM Form 8700-12 notifications (including all appropriate attachment pages and fees) each time their generator status changes, and comply with the requirements applicable to their actual monthly generator status.]
[Note: The ADEM Form 8700-12, Notification of Regulated Waste Activity, is not complete without payment of all the appropriate fees specified in Chapter 335-1-6 of the ADEM Administrative Code.]
Ala. Admin. Code r. 335-14-3-.01
Author: Sonja B. Favors; Brent A. Watson; Jonah L. Harris
Statutory Authority:Code of Ala. 1975, §§ 22-30-11, 22-30-13, 22-30-14.