Hg = 2.5H
Hg = H + 1.5 L,
where
Hg = good engineering practice stack height measured from the ground-level elevation at the base of the stack,
H = height of nearby structure(s) measured from the ground-level elevation at the base of the stack,
L = lesser dimension, height or projected width of nearby structure(s), provided that the Director may require the use of a field study or fluid model to verify GEP stack height for the source; or
Author: Richard E. Grusnick
Ala. Admin. Code r. 335-3-16-.02
Statutory Authority:Code of Ala. 1975, §§ 22-22A-4, 22-22A-5, 22-22A-6, 22-22A-8.