Total Valuation | Plan Review Fee | Permit Fee |
Less than $1000 | No fee. | No fee, unless inspection required, in which case a $15.00 fee for each inspection shall be charged. |
$1,001 to $50,000 | One-half of the permit fee which is $15.00 for the first $1,000.00 plus $5.00 for each additional thousand or fraction thereof, to and including $50,000.00. | $15.00 for the first $1,000.00 plus $5.00 for each additional thousand or fraction thereof, to and including $50,000.00. |
$50,001 to $100,000 | One-half of the permit fee which is $260.00 for the first $50,000.00 plus $4.00 or each additional thousand or fraction thereof, to and including $100,000.00. | $260.00 for the first $50,000.00 plus $4.00 or each additional thousand or fraction thereof, to and including $100,000.00. |
$100,001 to $500,000 | One-half of the permit fee which is $460.00 for the first $100,000.00 plus $3.00 for each additional thousand or fraction thereof, to and including $500,000.00. | $460.00 for the first $100,000.00 plus $3.00 for each additional thousand or fraction thereof, to and including $500,000.00. |
$500,001 and up | One-half of the permit fee which is $1,660.00 for the first $500,000.00 plus $2.00 for each additional thousand or fraction thereof. | $1,660.00 for the first $500,000.00 plus $2.00 for each additional thousand or fraction thereof. |
The total valuation of work shall be the cost of construction.
The "cost of construction" shall include the cost of the actual building construction, addition, or alteration work, including sitework.
Ala. Admin. Code r. 170-X-8-.02