Safety Zone; Missouri River Mile Markers 19-20 Florissant, MO

Download PDF
Federal RegisterSep 9, 2024
89 Fed. Reg. 72987 (Sep. 9, 2024)
Document Headings

Document headings vary by document type but may contain the following:

  • the agency or agencies that issued and signed a document
  • the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to
  • the agency docket number / agency internal file number
  • the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions
  • See the Document Drafting Handbook for more details.

    Department of Homeland Security Coast Guard 33 CFR Part 165
  • [Docket Number USCG-2024-0741]
  • RIN 1625-AA00
  • AGENCY:

    Coast Guard, DHS.

    ACTION:

    Temporary final rule.

    SUMMARY:

    The Coast Guard is establishing a temporary safety zone for the Missouri River at mile markers (MM) 19 through 20. The safety zone is needed to protect personnel, vessels, and the marine environment from potential hazards created by a power line wire crossing near Florissant, MO. Entry of vessels or persons into this zone is prohibited unless specifically authorized by the Captain of the Port, Sector Upper Mississippi River.

    DATES:

    For the purposes of enforcement, actual notice will be used from September 5, 2024, until September 9, 2024. This rule is effective without actual notice from September 9, 2024 through September 20, 2024.

    ADDRESSES:

    To view documents mentioned in this preamble as being available in the docket, go to https://www.regulations.gov, type USCG-2024-0741 in the search box and click “Search.” Next, in the Document Type column, select “Supporting & Related Material.”

    FOR FURTHER INFORMATION CONTACT:

    If you have questions about this rule, call or email MST1 Benjamin Conger, Sector Upper Mississippi River Waterways Management Division, U.S. Coast Guard; telephone 314-269-2573, email Benjamin.D.Conger@uscg.mil.

    SUPPLEMENTARY INFORMATION:

    I. Table of Abbreviations

    CFR Code of Federal Regulations

    DHS Department of Homeland Security

    FR Federal Register

    MM Mile marker

    NPRM Notice of proposed rulemaking

    § Section

    U.S.C. United States Code

    II. Background Information and Regulatory History

    The Coast Guard is issuing this temporary rule under authority in 5 U.S.C. 553(b)(B). This statutory provision authorizes an agency to issue a rule without prior notice and opportunity to comment when the agency for good cause finds that those procedures are “impracticable, unnecessary, or contrary to the public interest.” The Coast Guard finds that good cause exists for not publishing a notice of proposed rulemaking (NPRM) with respect to this rule because of potential hazards created by the power line crossing over the Missouri River that need to be addressed. As such, the Coast Guard lacks sufficient time to provide a reasonable comment period and then consider those comments before issuing the rule. It is impracticable to publish an NPRM because we must establish this safety zone by September 5, 2024.

    Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good cause exists for making this rule effective less than 30 days after publication in the Federal Register . Delaying the effective date of this rule would be impracticable because immediate action is needed to respond to the potential safety hazards associated with the power line crossing starting September 5, 2024.

    III. Legal Authority and Need for Rule

    The Coast Guard is issuing this rule under authority in 46 U.S.C. 70034. The Captain of the Port Sector Upper Mississippi (COTP) has determined that potential hazards associated with the power line crossing starting September 5, 2024, will be a safety concern for anyone operating in or transiting the Missouri River from or between MM 19-20. This rule is needed to protect personnel, vessels, and the marine environment in the navigable waters within the safety zone while the power line crossing is being conducted.

    IV. Discussion of the Rule

    This rule establishes a safety zone during a power line crossing project over the Missouri River on September 5, 2024 through September 20, 2024. The safety zone will cover all navigable waters from MM 19-20. The duration of the zone is intended to protect personnel, vessels, and the marine environment in these navigable waters while the power line crosses the Missouri River. No vessel or person will be permitted to enter the safety zone without obtaining permission from the COTP or a designated representative via VHF-FM channel 16, or through USCG Sector Upper Mississippi River at 314-269-2332. Persons and vessels permitted to enter the safety zone must comply with all lawful orders or directions issued by the COTP or designated representative. The COTP or a designated representative will inform the public of the effective period for the safety zone as well as any changes in the dates and times of enforcement, as well as reductions in the size of the safety zone as conditions improve, through Local Notice to Mariners (LNMs), Broadcast Notices to Mariners (BNMs), and/or Safety Marine Information Broadcast (SMIB), as appropriate.

    V. Regulatory Analyses

    We developed this rule after considering numerous statutes and Executive orders related to rulemaking. Below we summarize our analyses based on a number of these statutes and Executive orders, and we discuss First Amendment rights of protestors.

    A. Regulatory Planning and Review

    Executive Orders 12866 and 13563 direct agencies to assess the costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits. This rule has not been designated a “significant regulatory action,” under section 3(f) of Executive Order 12866, as amended by Executive Order 14094 (Modernizing Regulatory Review). Accordingly, this rule has not been reviewed by the Office of Management and Budget (OMB).

    This regulatory action determination is based on a safety zone located on the Missouri River between MM 19-20 near Florissant, MO. The safety zone will be active only while work associated with the power line crossing is being conducted, from September 5, 2024, until September 20, 2024.

    B. Impact on Small Entities

    The Regulatory Flexibility Act of 1980, 5 U.S.C. 601-612, as amended, requires Federal agencies to consider the potential impact of regulations on small entities during rulemaking. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000. The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will not have a significant economic impact on a substantial number of small entities.

    While some owners or operators of vessels intending to transit the safety zone may be small entities, for the reasons stated in section V.A above, this rule will not have a significant economic impact on any vessel owner or operator.

    Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we want to assist small entities in understanding this rule. If the rule would affect your small business, organization, or governmental jurisdiction and you have questions concerning its provisions or options for compliance, please call or email the person listed in the FOR FURTHER INFORMATION CONTACT section.

    Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR (1-888-734-3247). The Coast Guard will not retaliate against small entities that question or complain about this rule or any policy or action of the Coast Guard.

    C. Collection of Information

    This rule will not call for a new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).

    D. Federalism and Indian Tribal Governments

    A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on the States, on the relationship between the National Government and the States, or on the distribution of power and responsibilities among the various levels of government. We have analyzed this rule under that Order and have determined that it is consistent with the fundamental federalism principles and preemption requirements described in Executive Order 13132.

    Also, this rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it does not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.

    E. Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 (adjusted for inflation) or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.

    F. Environment

    We have analyzed this rule under Department of Homeland Security Directive 023-01, Rev. 1, associated implementing instructions, and Environmental Planning COMDTINST 5090.1 (series), which guide the Coast Guard in complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321-4370f), and have determined that this action is one of a category of actions that do not individually or cumulatively have a significant effect on the human environment. This rule involves a safety zone encompassing the width of the Missouri River between MM 19 through 20. It is categorically excluded from further review under paragraph L60(a) of Appendix A, Table 1 of DHS Instruction Manual 023-01-001-01, Rev. 1. A Record of Environmental Consideration supporting this determination is available in the docket. For instructions on locating the docket, see the ADDRESSES section of this preamble.

    G. Protest Activities

    The Coast Guard respects the First Amendment rights of protesters. Protesters are asked to call or email the person listed in the FOR FURTHER INFORMATION CONTACT section to coordinate protest activities so that your message can be received without jeopardizing the safety or security of people, places, or vessels.

    List of Subjects in 33 CFR Part 165

    • Harbors
    • Marine Safety
    • Navigation (water)
    • Reporting and recordkeeping requirements
    • Security measures
    • Waterways

    For the reasons discussed in the preamble, the Coast Guard amends 33 CFR part 165 as follows:

    PART 165—REGULATED NAVIGATION AREAS AND LIMITED ACCESS AREAS

    1. The authority citation for part 165 continues to read as follows:

    Authority: 46 U.S.C. 70034, 70051, 70124; 33 CFR 1.05-1, 6.04-1, 6.04-6, and 160.5; Department of Homeland Security Delegation No. 00170.1, Revision No. 01.3.

    2. Add § 165.T08-0741 to read as follows:

    § 165.T08-0741
    Safety Zone; Missouri River, Mile Markers 19-20, Florissant, MO.

    (a) Location. The following area is a safety zone: all navigable waters within the Missouri River, Mile Markers (MM) 19-20.

    (b) Enforcement period. This section is subject to enforcement from September 5, 2024, through September 20, 2024.

    (c) Regulations. (1) In accordance with the general safety zone regulations in subpart C of this part, entry of persons or vessels into this safety zone described in paragraph (a) of this section is prohibited unless authorized by the COTP or a designated representative. A designated representative is a commissioned, warrant, or petty officer of the U.S. Coast Guard (USCG) assigned to units under the operational control of USCG Sector Upper Mississippi River.

    (2) To seek permission to enter, contact the COTP or a designated representative via VHF-FM channel 16, or through USCG Sector Upper Mississippi River at 314-269-2332. Persons and vessels permitted to enter the safety zone must comply with all lawful orders or directions issued by the COTP or designated representative.

    (d) Informational broadcasts. The COTP or a designated representative will inform the public of the effective period for the safety zone as well as any changes in the dates and times of enforcement, as well as reductions in size or scope of the safety zone as ice or flood conditions improve, through Local Notice to Mariners (LNMs), Broadcast Notices to Mariners (BNMs), and/or Safety Marine Information Broadcast (SMIB) as appropriate.

    Dated: September 3, 2024.

    A.R. Bender,

    Captain, U.S. Coast Guard, Captain of the Port Sector Upper Mississippi River.

    [FR Doc. 2024-20206 Filed 9-6-24; 8:45 am]

    BILLING CODE 9110-04-P