Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship Canal, Chicago River, and Calumet-Saganashkee Channel, Chicago, IL

Download PDF
Federal RegisterAug 2, 2017
82 Fed. Reg. 35900 (Aug. 2, 2017)

AGENCY:

Coast Guard, DHS.

ACTION:

Notice of enforcement of regulation.

SUMMARY:

The Coast Guard will enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal, Chicago River, Calumet-Saganashkee Channel on all waters of the Chicago Sanitary and Ship Canal between Mile Marker 296.1 to Mile Marker 296.7 at specified times from July 31, 2017 until September 1, 2017. This action is necessary to protect the waterway and vessels from the potential hazards associated with barge entrainment mitigation trials conducted by the U.S. Fish and Wildlife Service at the U.S. Army Corps of Engineer's electric dispersal barrier.

DATES:

The regulations in 33 Code of Federal Regulations (CFR) 165.930 will be enforced from August 2, 2017, through 6 p.m. on September 1, 2017. For purposes of enforcement, actual notice will be used from 8 a.m. on July 31, 2017, through August 2, 2017.

FOR FURTHER INFORMATION CONTACT:

If you have questions about this notice of enforcement, call or email LT John Ramos Waterways Management Division, Marine Safety Unit Chicago, U.S. Coast Guard; telephone 630-986-2155; email address D09-DG-MSUChicago-Waterways@uscg.mil.

SUPPLEMENTARY INFORMATION:

The Coast Guard will enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal, Chicago River, Calumet-Saganashkee Channel, Chicago, IL, listed in 33 CFR 165.930. Specifically, the Coast Guard will enforce this safety zone on all waters of the Chicago Sanitary and Ship Canal between Mile Marker 296.1 to Mile Marker 296.7. Enforcement will occur on each Monday through Friday from 8 a.m. until 6 p.m., from July 31, 2017 through September 1, 2017. During the enforcement period, no vessel may transit this regulated area without approval from the Captain of the Port Lake Michigan or a Captain of the Port Lake Michigan designated representative. Vessels and persons granted permission to enter the safety zone shall obey all lawful orders or directions of the Captain of the Port Lake Michigan, or his or her on-scene representative.

This notice of enforcement is issued under the authority of 33 CFR 165.930 and 5 U.S.C. 552(a). In addition to this publication in the Federal Register, the Captain of the Port Lake Michigan will also provide notice through other means, which will include Broadcast Notice to Mariners, Local Notice to Mariners, distribution in leaflet form, and on-scene oral notice. Additionally, the Captain of the Port Lake Michigan may notify representatives from the maritime industry through telephonic and email notifications. If the Captain of the Port or a designated representative determines that the regulated area need not be enforced for the full duration stated in this notice of enforcement, he or she may use a Broadcast Notice to Mariners to grant general permission to enter the regulated area. The Captain of the Port Lake Michigan or a designated on-scene representative may be contacted via Channel 16, VHF-FM or at (414) 747-7182.

Dated: July 27, 2017.

Thomas J. Stuhlreyer,

Captain, U.S. Coast Guard, Captain of the Port Lake Michigan.

[FR Doc. 2017-16248 Filed 8-1-17; 8:45 am]

BILLING CODE 9110-04-P